{"id":8396,"date":"2026-09-22T11:16:26","date_gmt":"2026-09-22T03:16:26","guid":{"rendered":"https:\/\/kbcolour.com\/?p=8396"},"modified":"2026-10-22T22:13:23","modified_gmt":"2026-10-22T14:13:23","slug":"72-hours-to-bring-an-icon-to-lifekb-colour-at-international-sustainability-week-2026","status":"publish","type":"post","link":"https:\/\/kbcolour.com\/zh\/72-hours-to-bring-an-icon-to-lifekb-colour-at-international-sustainability-week-2026\/","title":{"rendered":"72 Hours to Bring an Icon to Life:KB Colour at International Sustainability Week 2026"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Sometimes, great execution begins with very little time.<br><br>For International Sustainability Week (ISW) 2026, held on 10-11 September at MITEC Kuala Lumpur, KB Colour was approached with a last-minute challenge: to design and fabricate a sustainable interpretation of one of Malaysia&#8217;s most recognisable landmarks &#8211; Merdeka 118.<br><br>The timeline? Just 72 hours.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>From Brief to Build<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">With the clock already running, our team moved quickly from concept development to material planning, fabrication and final execution.<br><br>The objective was to create a recognisable interpretation of Merdeka 118 while keeping the structure aligned with the sustainability focus of the event. The result was a sculptural piece constructed using paper-based material, translating the tower&#8217;s distinctive silhouette into a lightweight, dimensional form.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Photo caption :<\/em><\/strong> <em>From fabrication floor to exhibition floor &#8211; the Merdeka 118 structure taking shape at KB Colour.<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.09.28-AM.jpeg\" alt=\"\" class=\"wp-image-8398\" srcset=\"https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.09.28-AM.jpeg 768w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.09.28-AM-225x300.jpeg 225w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.09.28-AM-630x840.jpeg 630w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.09.28-AM-495x660.jpeg 495w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>72 Hours. One Team.<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A short turnaround leaves little room for hesitation.<br><br>Design decisions, structural considerations, fabrication and finishing had to happen almost simultaneously. What would normally allow for a longer development process became a focused 72-hour effort involving close coordination across the KB team.<br><br>It was a reminder that execution isn&#8217;t only about having the right equipment or materials. It&#8217;s also about having people who can respond, adapt and find solutions when timelines change.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Photo caption :<\/em><\/strong> <em>Sustainably fabricated by KB Colour &#8211; a close-up of the finished installation and project credit.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Sustainability Made Tangible<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.16.52-AM.jpeg\" alt=\"\" class=\"wp-image-8399\" srcset=\"https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.16.52-AM.jpeg 768w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.16.52-AM-225x300.jpeg 225w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.16.52-AM-495x660.jpeg 495w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.16.52-AM-630x840.jpeg 630w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">At an event centred on building a more sustainable future, the installation became a simple demonstration of how creative fabrication and material choices can work together.<br><br>Rather than treating sustainability only as a message to be printed on a wall, the Merdeka 118 piece turned that idea into something visitors could experience physically &#8211; showing how paper-based materials can be transformed beyond conventional print applications.<br><br>It reflects an approach KB continues to explore: thinking beyond printing to find new possibilities in materials, fabrication and execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Photo caption :<\/em><\/strong> <em>The completed Merdeka 118 installation at International Sustainability Week 2026.<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.15.35-AM.jpeg\" alt=\"\" class=\"wp-image-8400\" srcset=\"https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.15.35-AM.jpeg 768w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.15.35-AM-225x300.jpeg 225w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.15.35-AM-495x660.jpeg 495w, https:\/\/kbcolour.com\/wp-content\/uploads\/2026\/09\/WhatsApp-Image-2026-09-10-at-11.15.35-AM-630x840.jpeg 630w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>From Challenge to Exhibition Floor<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Within 72 hours, an urgent brief became a completed installation standing on the exhibition floor at MITEC.<br><br>For us, the project wasn&#8217;t simply about working fast. It was about bringing together ideas, materials, craftsmanship and teamwork to deliver when it mattered.<br><br>Because sometimes, thinking beyond printing also means being ready to turn an unexpected challenge into something real.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Photo caption :<\/em><\/strong> <em>The finished installation on the exhibition floor at MITEC Kuala Lumpur.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>KB Colour &#8211; We Think Beyond Printing.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>For International Sustainability Week (ISW) 2026, held on 10-11 September at MITEC Kuala Lumpur, KB Colour was approached with a last-minute challenge: to design and fabricate a sustainable interpretation of one of Malaysia&#8217;s most recognisable landmarks &#8211; Merdeka 118.<\/p>","protected":false},"author":2,"featured_media":8397,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[],"class_list":["post-8396","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-first"],"_links":{"self":[{"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/posts\/8396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/comments?post=8396"}],"version-history":[{"count":1,"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/posts\/8396\/revisions"}],"predecessor-version":[{"id":8401,"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/posts\/8396\/revisions\/8401"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/media\/8397"}],"wp:attachment":[{"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/media?parent=8396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/categories?post=8396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kbcolour.com\/zh\/wp-json\/wp\/v2\/tags?post=8396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}